The question

To ask the Secretary of State for Energy Security and Net Zero, with reference to the oral contribution of the then Minister for Energy Security and Net Zero of 23 May 2024, Official Report, column 1122, if he will make it his policy to conduct a review of the presumption for overhead power lines in the context of the comparative merits and costs of (a) undergrounding and (b) offshore energy cabling.

Answered by Michael Shanks

Proposed changes to the energy National Policy Statements (NPSs) were consulted on between 30 March 2023 to 23 June 2023 under the previous government. Following this a revised version of the National Policy Statement for electricity networks infrastructure was designated on 17 January 2024. This sets out that overhead lines should be the strong starting presumption for electricity networks developments in general, except in nationally designated landscapes where undergrounding is the starting presumption. The government does not make assessments for specific projects until they come to the Secretary of State for final planning decision.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim