Midland Main Line: Rolling Stock
The question
To ask the Secretary of State for Transport, what her planned timetable is for introducing new trains on the Midland Mainline between Sheffield and London.
Answered by Simon Lightwood
Under East Midlands Railway’s plan, the new Class 810 ‘Aurora’ Bi-mode trains will commence passenger service operation during 2025, with phased introduction continuing into 2026.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →