Asked by Caroline VoadenLiberal DemocratDepartment for TransportTabled Answered 9 September 2024UIN 3544

The question

To ask the Secretary of State for Transport, what contractual penalties will be incurred by (a) the A303 Stonehenge tunnel, (b) the A27 bypass project and (c) other major infrastructure projects that have now been cancelled.

Answered by Lilian Greenwood

In the case of the A303 Amesbury to Berwick Down (Stonehenge Tunnel), although the contracts were awarded, the construction had not commenced. Following the announcement to cancel the project National Highways is working with its contractors to bring ontracts to a close in a controlled manner.


In the case of the A27 Arundel bypass, although a design and build contract had been awarded, construction had not commenced and following the deferral announcement in March 2023 the contract was brought to a controlled close with limited liabilities or additional costs.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim