Sewage: Infrastructure

Asked by Blake StephensonConservativeDepartment for Environment, Food and Rural AffairsTabled Answered 11 October 2024UIN 6868

The question

To ask the Secretary of State for Environment, Food and Rural Affairs, what steps his Department plans to take to upgrade sewage infrastructure in Mid Bedfordshire constituency in this Parliament.

Answered by Emma Hardy

The Secretary of State and I have secured agreement that funding for vital infrastructure investment is ringfenced and can only be spent on upgrades benefiting customers and the environment.

There are several schemes at sewage treatment works in the Mid-Bedfordshire constituency that have been or will be completed during Asset Management Period (AMP) 7 (2020 – 2025). This includes a 0.5 mg/l Phosphate limit at Marston Mortaine STW to be delivered by 22/12/2024.

A groundwater investigation into water quality at Upper Sundon has been completed. Five other works have also had investigations into storm overflows, flows within the works and storm and flow monitors installed.

Other improvements to the infrastructure, including the sewer network and at sewage treatment works will be carried out by Anglian Water through a part of their AMP. We do not have sight of this.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →