VerbatimParliament, as it happens

Sewage: Lincolnshire

Asked by Sir John HayesConservativeDepartment for Environment, Food and Rural AffairsTabled Answered 15 October 2024UIN 7713

The question

To ask the Secretary of State for Environment, Food and Rural Affairs, what steps his Department plans to take to upgrade sewage infrastructure in (a) South Holland and the Deepings constituency and (b) Lincolnshire.

Answered by Emma Hardy

For too long, investment has not kept pace with the challenges of an ageing infrastructure system, a rapidly growing population, and climate change. Water companies are now expected to deliver £88 billion of investment between 2025 and 2030 across England and Wales. This will improve more than 2,500 projects to reduce spills from storm overflows and upgrades to over 1,500 wastewater treatment works.

Sewage infrastructure upgrades are the responsibility of the water company. As part of the Environment Act 2021, a duty exists for water companies in England to produce Drainage and Wastewater Management Plans (DWMPs).

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim