VerbatimParliament, as it happens

Sewage: Weybridge

Asked by Dr Ben SpencerConservativeDepartment for Environment, Food and Rural AffairsTabled Answered 23 October 2024UIN 9570

The question

To ask the Secretary of State for Environment, Food and Rural Affairs, what assessment he has made of the (a) adequacy of improvements to Weybridge sewage works and (b) extent of further work needed to reduce storm overflows from that site.

Answered by Emma Hardy

The Environment Agency (EA) has required Thames Water to improve the Event Duration Monitoring of storm overflows at Weybridge Sewage Treatment works as part of the current Water Industry National Environment Programme (WINEP) 2020-25. The EA has inspected Weybridge Sewage Treatment Works in 2024 and is currently investigating possible permit breaches at the site. The regulators will not let companies get away with illegal activity and where breaches are found, will not hesitate to hold companies to account.

Further improvement schemes are planned as part of the WINEP 2025-2030 including tightening of environmental permit limits for phosphorous.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim