VerbatimParliament, as it happens

Railway Network: Snow and Ice

Asked by Mr Tanmanjeet Singh DhesiLabourDepartment for TransportTabled Answered 9 December 2024UIN 17005

The question

To ask the Secretary of State for Transport, what discussions she has had with Network Rail on steps to prepare the rail network for adverse winter weather.

Answered by Simon Lightwood

Network Rail owns and is responsible for maintaining railway infrastructure to ensure passenger and freight services operate safely. Officials hold regular discussions with Network Rail and industry to ensure winter preparedness plans are in place with clear mitigations to reduce the impacts of winter weather on punctuality and reliability. Network Rail Routes liaise closely with train operators to ensure comprehensive winter checklists are in place and to align customer messaging. Additionally, in Control Period 7 between 2024-2029, Network Rail plans to invest c.£2.8bn to help it better cope with extreme weather and climate change, ultimately safeguarding a more reliable railway.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim