Carbon Capture and Storage: Tees Valley

Asked by John MilneLiberal DemocratDepartment for Energy Security and Net ZeroTabled Answered 13 December 2024UIN 17462

The question

To ask the Secretary of State for Energy Security and Net Zero, how many projects in the Teesside carbon capture and storage cluster are (a) existing projects being retrofitted and (b) new developments.

Answered by Sarah Jones

The Teesside Carbon Capture and storage cluster includes the projects mentioned below:

NEP (Transport and Storage Network) - New network with Northern Endurance Partnership

Net Zero Teesside (NZT) - New dispatchable gas-fired power station with carbon capture technology

H2 Teesside - New build CCUS-enabled hydrogen production plant

BOC - Existing industrial plant owned by BOC looking to add CCUS technology

The NEP and NZT are included in the current funding envelope related to the funding announcement made in October 2024.

H2 Teesside and BOC are currently a part of the Project Negotiation List (PNL). Following a period of assessment and due diligence, the Track 1 PNL was determined and published in March 2023. Projects that were most likely to be delivered within our required timeframes and budget and storage capacity were selected.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim