Type 32 Frigates

Asked by David ReedConservativeMinistry of DefenceTabled Answered 9 December 2024UIN 17483

The question

To ask the Secretary of State for Defence, what the expected timeline is for the Type 32 frigate programme to move from the concept phase to design and procurement.

Answered by Maria Eagle

The Type 32 frigate programme remains in the concept phrase and has not yet reached the level of maturity to allow publication of a specific timetable for design and procurement. This is consistent with a programme of this size and complexity at this early stage in its development.