Asked by Mr Andrew SnowdenConservativeDepartment for Energy Security and Net ZeroTabled Answered 20 December 2024UIN 20865

The question

To ask the Secretary of State for Energy Security and Net Zero, pursuant to the answer of 17 December 2024 to question 19898 on Wind Power: Fylde, what account the cost assessments have taken of existing infrastructure connecting Stanah to Penwortham.

Answered by Michael Shanks

National Energy System Operator (NESO) recommended the transmission infrastructure required to connect Morgan and Morecambe offshore wind projects to the grid as part of its Holistic Network Design (HND). In producing the HND, NESO assessed multiple onshore and offshore design options against future generation and demand scenarios, existing infrastructure in the National Electricity Transmission System, and total capital and operational costs. NESO then used an economic optimiser to determine the optimal economic design from the options.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →