East West Rail Line: Construction

Asked by Blake StephensonConservativeDepartment for TransportTabled Answered 15 January 2025UIN 22408

The question

To ask the Secretary of State for Transport, what estimate her Department has made of the cost of constructing East-West Rail in 2024 prices.

Answered by Lilian Greenwood

£1.3bn has been provided towards the delivery of East West Rail Connection Stage 1 (CS1) which will provide services from Oxford to Bletchley and Milton Keynes.

The capital cost estimate for Connection Stages 2 (Oxford-Bedford) and 3 (Oxford-Cambridge) is £5bn-£6bn in 2021 prices. Final costs for the project will be driven by scope and design choices.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim