Motorways: Repairs and Maintenance

Asked by Mr Clive BettsLabourDepartment for TransportTabled Answered 13 January 2025UIN 22573

The question

To ask the Secretary of State for Transport, whether the impact of time delays on road users is taken into account when determining the length of motorway (a) maintenance and (b) improvement contracts.

Answered by Lilian Greenwood

For maintenance activities, National Highways operates long-term Maintenance & Response (M&R) contracts, typically spanning 8–15 years. These contracts handle tens of thousands of interventions across the Strategic Road Network annually. Currently, there are 10 M&R contracts, each covering approximately the same road network length as 10 years ago. However, on average, the contract durations have slightly increased compared to their previous iterations. To minimise the impact on customers, National Highways ensures that individual maintenance activities are carefully planned, with most works conducted overnight and designed to have minimal disruption.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim