National Grid: Construction

Asked by James CartlidgeConservativeDepartment for Energy Security and Net ZeroTabled Answered 16 January 2025UIN 23388

The question

To ask the Secretary of State for Energy Security and Net Zero, pursuant to the Answer of 5 December 2024 to Question 17189 on National Grid: Costs of the Western and Eastern Links, if he will make an estimate of the time for delivering the onshore option for Eastern Green Link 1 and 2.

Answered by Michael Shanks

At the time of Ofgem’s decision for Eastern Green Link (EGL) 1&2 Final Need Case, an onshore option was expected to be delivered by 2036, based on information provided by the Transmission Owner, National Grid Electricity Transmission. It was not included as part of the Final Need Case,[1] as analysis conducted by the Electricity System Operator found that the reinforcement was needed earlier than the onshore option could be delivered.[2]

[1] https://www.ofgem.gov.uk/sites/default/files/2024-11/EGL1%20Project%20Assessment%20Decision%20Final.pdf

[2] https://www.neso.energy/document/162356/download

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim