9 Downing Street: Media
The question
To ask the Minister for the Cabinet Office, pursuant to the Answer of 25 November 2024 to Question 13808 on 9 Downing Street: Media, what (a) alterations and (b) other works have taken place in the media room since November 2024; what the cost of those works was; which contractors were used; and which Department authorised the cost of these works.
Answered by Georgia Gould
A one-off refresh of the facility was undertaken in December 2024. This has restored the room back to its original politically neutral state. The cost of these works will be published in due course in Cabinet Office transparency returns. The works were carried out by OCS, and authorised by the Cabinet Office.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →