Boeing E-7: Procurement

Asked by Johanna BaxterLabourMinistry of DefenceTabled Answered 28 January 2025UIN 25383

The question

To ask the Secretary of State for Defence, what recent progress he has made on the E7 Wedgetail programme.

Answered by Maria Eagle

The Wedgetail programme has seen the first aircraft complete three test flights, be painted in the markings of 8 Squadron and continues with the installation of mission equipment at STS Aviation at Birmingham Airport, before entering the test and evaluation phase later this year. Aircraft two and three are progressing with integrating their modifications as planned.

The infrastructure programme at RAF Lossiemouth has delivered the combined Poseidon and Wedgetail engineering line facility, as well as 8 Squadron headquarters office accommodation, with the final elements of the technical facility expected to be handed over in March 2025.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim