VerbatimParliament, as it happens

A28: Bridges

Asked by Sojan JosephLabourDepartment for TransportTabled Answered 4 February 2025UIN 27725

The question

To ask the Secretary of State for Transport, whether she has had recent discussions with the Highways Agency on increasing the height of the railings on the A28 overbridge over the M20 between junctions 9 and 10.

Answered by Lilian Greenwood

There have not been recent discussions between the Secretary of State and National Highways on increasing the height of the railings on the A28 overbridge over the M20 between junctions 9 and 10. Both the Department and National Highways take the issue of safety very seriously and are committed to improving the Strategic Road Network (SRN) to provide a safer network. The raising of bridge parapets (safety barriers/railings along the edge of bridges) is not always a straightforward piece of work and can typically require complete replacement of the bridge structure. National Highways usually undertakes this type of work on a priority basis across the whole of the SRN.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim