Asked by Mr Mark FrancoisConservativeMinistry of DefenceTabled Answered 11 February 2025UIN 28897

The question

To ask the Secretary of State for Defence, what factors contributed to the Protector drone system's downgrade to a red rating in the IPA Annual Report 2023-24; what steps are being taken to mitigate significant cost increases and delays; and what the revised timeline is for the system's full operational capability.

Answered by Maria Eagle

The downgrade of Protector to a red rating was primarily driven by a delay to the approval of the Review Note, which is being considered as part of the ongoing Strategic Defence Review. There are no anticipated cost increases, and all costs captured within the Review Note remain extant. The Full Operational Capability timelines have not yet been agreed and will be detailed in a future Review Note.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim