Electric Cables: Costs

Asked by Dave DooganScottish National PartyDepartment for Energy Security and Net ZeroTabled Answered 25 February 2025UIN 31520

The question

To ask the Secretary of State for Energy Security and Net Zero, whether Ofgem have made an estimate of the relative costs per KM of installing (a) overhead, (b) underground and (c) offshore electricity transmission cables for energy transmission infrastructure.

Answered by Michael Shanks

Ofgem estimates of the relative costs of overhead, underground and offshore electricity transmission cables vary significantly depending on various factors such as technology types, voltage levels and locations. Due to commercial sensitivity, Ofgem cannot not share specific estimates. However, as set out in the Institution of Engineering and Technology’s 2012 study, offshore cables have considerable cost and technical challenges and can have substantial impacts on the marine environment. Undergrounding is usually by open trenching with costs between 5-10 times those of overhead lines.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim