National Grid: Darlington

Asked by Lola McEvoyLabourDepartment for Energy Security and Net ZeroTabled Answered 5 March 2025UIN 33621

The question

To ask the Secretary of State for Energy Security and Net Zero, how many projects are waiting to be connected to the National Grid in Darlington constituency.

Answered by Michael Shanks

The Government does not hold data on projects awaiting a grid connection on a constituency basis. The latest national register for transmission connections is available at https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register/tec_register_-_25_february_2025 and for distribution connections in the North-East at https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/information/?disjunctive.local_authority&disjunctive.point_of_connection_poc_voltage_kv

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim