Dorchester South Station: Lifts

Asked by Edward MorelloLiberal DemocratDepartment for TransportTabled Answered 6 March 2025UIN 34171

The question

To ask the Secretary of State for Transport, what progress she has made on the feasibility study for installing lifts at Dorchester South station under the Access for All programme; and what her planned timetable is for the completion of those lifts.

Answered by Lilian Greenwood

Network Rail are expected to complete the feasibility study for Dorchester South by late spring 2025. Once all 50 studies within the Access for All programme have been completed, expected by summer 2025, Network Rail will be able to confirm a delivery schedule. Stations selected for delivery are due to be completed by 2029.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim