VerbatimParliament, as it happens

Dorchester South Station: Access

Asked by Edward MorelloLiberal DemocratDepartment for TransportTabled Answered 6 March 2025UIN 34172

The question

To ask the Secretary of State for Transport, whether she plans to (a) install lifts, (b) reopen the subway and (c) implement other measures to enhance accessibility at Dorchester South station.

Answered by Lilian Greenwood

Stations in the Access for All programme including Dorchester South railway station follow the normal Network Rail project lifecycle, including option selection and detailed design, which once complete will inform which measures are installed to improve accessibility at the station.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim