Guided Weapons: Procurement

Asked by Alex BurghartConservativeMinistry of DefenceTabled Answered 1 April 2025UIN 40328

The question

To ask the Secretary of State for Defence, with reference to his Department’s press release entitled Historic £1.6bn deal provides thousands of air defence missiles for Ukraine and boosts UK jobs and growth, published 2 March 2025, whether contractual contingency measures exist within the contract in the event of (a) production delays, (b) cost overruns and (c) failure to meet performance criteria.

Answered by Maria Eagle

The contract includes provisions to incentivise the specified delivery dates and, where relevant, performance criteria, with remedies available if those contractual obligations are not met. The scope will be placed in a phased manner, with the intent being that each phase is subject to a firm price.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim