VerbatimParliament, as it happens

10 Downing Street: Repairs and Maintenance

Asked by Mike WoodConservativeCabinet OfficeTabled Answered 10 April 2025UIN 43944

The question

To ask the Minister for the Cabinet Office, pursuant to the Answer of 31 March 2025 to Question 39120 on 10 Downing Street: Repairs and Maintenance, what the budget is for the works; whether the works (a) required planning permission and (b) are structural; and what the nature of the repair works is other than to the external window frames.

Answered by Ms Abena Oppong-Asare

A repair project is underway to preserve the integrity of this Grade 1 listed building. Maintenance of the roof will be carried out alongside repair of exterior window frames. This followed a survey in December 2023 which indicated that work must be completed for safety reasons, with the work commencing in January 2024. The repairs are not structural and did not require planning permission. The cost of these works will be published in due course in Cabinet Office transparency returns.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim