Type 26 Frigates: Procurement

Asked by James CartlidgeConservativeMinistry of DefenceTabled Answered 22 April 2025UIN 44507

The question

To ask the Secretary of State for Defence, what recent progress his Department has made on the Type 26 Global Combat Ship Programme.

Answered by Maria Eagle

The Ministry of Defence continues to work closely with BAE Systems (BAES) to ensure the Type 26 programme remains on track to meet all user requirements and deliver world-class Anti-Submarine Warfare (ASW) frigates to replace the Type 23.

Following the steel-cut ceremony for HMS Sheffield on 28 November 2024, five of the eight Type 26 frigates are now under construction on the Clyde. HMS Cardiff is structurally complete and has joined HMS Glasgow in the dry dock at Scotstoun for the outfitting phase. Unit and block assembly on HMS Belfast and HMS Birmingham continues.

HMS Glasgow is forecast to achieve Initial Operating Capability in 2028, with construction of all eight frigates expected to be complete by the mid-2030s.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim