Boeing E-7: Repairs and Maintenance
The question
To ask the Secretary of State for Defence, what the status is of the (a) modification and (b) integration processes for the second and third E-7 Wedgetail aircraft.
Answered by Maria Eagle
The modification of the second and third E-7 Wedgetail aircraft continues.The second Multi-role Electronically Scanned Array (MESA) radar is fitted to aircraft two and the third MESA is on site and scheduled to be fitted in June 2025.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →