East West Rail Line: Iron and Steel

Asked by Alex MayerLabourDepartment for TransportTabled Answered 9 June 2025UIN 55600

The question

To ask the Secretary of State for Transport, what estimate her Department has made of the volume of British-produced steel used in the construction of the East West Rail project from Bletchley to Oxford; and what estimate she has made of the volume required for the new build section to Cambridge.

Answered by Simon Lightwood

All rail used in the build of Connection Stage 1 (Oxford to Milton Keynes) was British Steel supplied via Network Rail SCO operations, which amounts to just under 4,100 tonnes. There would also have been a small additional amount used in built structures and stations.

The section between Bedford and Cambridge is still at the preliminary design phase and a total estimate of the volume of steel required is not yet available. However, current estimates suggest around 12,300 tonnes of new plain line track will be required.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim