Asked by Richard FullerConservativeDepartment for Energy Security and Net ZeroTabled Answered 17 June 2025UIN 58192

The question

To ask the Secretary of State for Energy Security and Net Zero, what assessment his Department has made of the feasibility of installing a grid connection corridor along the A1 and A421 to enable commercial warehouses in that area to connect rooftop solar installations to the National Grid.

Answered by Michael Shanks

Distribution Network Operators are upgrading local electricity distribution networks across Great Britain to enable the connection of low carbon generation, including rooftop solar. For the current electricity distribution price control (RIIO-ED2, 2023-2028), Ofgem have allowed £22.2bn of upfront investment, including £3.1bn for network upgrades for low-carbon technologies. For the next electricity distribution price control (RIIO-ED3, 2028-2033), Regional Energy Strategic Plans (RESPs) will support strategic network investment ahead of need, on a locational basis. The government will continue to support Ofgem in ensuring that consumer costs are protected while enabling the network transformation required for net zero.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim