VerbatimParliament, as it happens

Driving: Disability

Asked by Joe RobertsonConservativeDepartment for TransportTabled Answered 21 July 2025UIN 68222

The question

To ask the Secretary of State for Transport, what is the cost to the public purse of the higher-rate mobility component of the Personal Independence Payment for the (a) London Congestion Charge, (b) Ultra Low Emission Zone charge, (c) Dart Charge, (d) Blackwall and Silvertown Tunnel charge, (e) Tyne Tunnel toll, (f) M6 Toll, (g) Humber Bridge toll and (h) Mersey Gateway Bridge toll.

Answered by Lilian Greenwood

The Department does not hold this information. The only undertaking cited that is operated by National Highways on behalf of the Department is Dart Charge, and while National Highways records the number of crossings made by vehicles exempt from Vehicle Excise Duty, it does not know the reason why a vehicle is exempt.

The other undertakings cited are the responsibility of the relevant local authority or group of authorities, except the M6 Toll, which is a privately owned asset without any recourse to public funds.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim