VerbatimParliament, as it happens

River Thames: Public Footpaths

Asked by Mr Joshua ReynoldsLiberal DemocratDepartment for Environment, Food and Rural AffairsTabled Answered 20 October 2025UIN 81013

The question

To ask the Secretary of State for Environment, Food and Rural Affairs, what estimate her Department has made of the cost to the public purse of reinstating (a) full public access and (b) navigation at Temple Footbridge in Hurley.

Answered by Emma Hardy

Full navigation access at Temple Footbridge will be reinstated once the central section of the bridge is removed and taken off site for inspection and secure storage. This is now expected to take place in November 2025, at a cost of approximately £450,000. Public pedestrian access will be reinstated once the bridge is either refurbished or replaced. The costs of this will be known once the outline design is completed in March 2026 and the removed central section in fully inspected.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim