To ask the Secretary of State for Energy Security and Net Zero, what assessment his Department has made of the potential impact of small modular reactor projects on (a) long-term waste management and (b) decommissioning.

Answered by Michael Shanks

Under the Energy Act 2008, prospective operators of nuclear power stations providing power directly to the grid are required to have a Funded Decommissioning Programme (FDP), making arrangements to cover the full costs of decommissioning and their full share of waste management and disposal costs, approved by the Secretary of State before nuclear-related construction can begin, and to then comply with that programme thereafter.

Based on current proposals for small modular reactors, the government anticipates that waste from such projects would be largely similar in nature to the current operating fleet, with low level waste disposable in existing facilities, while more hazardous waste would be stored pending disposal in a geological disposal facility when it becomes available.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim