Royal Centre for Defence Medicine: Housing

Asked by Laurence TurnerLabourMinistry of DefenceTabled Answered 19 November 2025UIN 88520

The question

To ask the Secretary of State for Defence, what the cost to the public purse was of constructing Glenart Castle Mess in Longbridge.

Answered by Luke Pollard

Glenart Castle Mess was constructed in July 2017. The total construction time for the entire project, including planning/prebuild and post-building works was from 2014 to 29 September 2017. The capital cost of the construction of Glenart Castle Mess in Longbridge, was £29.5 million. This figure reflects the cost of building the Mess itself. However, the total capital cost of the wider project, which included associated infrastructure such as utilities, highways, hardstanding, weather protection shelters, and risk assessments, was c£36.2 million.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim