VerbatimParliament, as it happens

Level Crossings

Asked by Mr Richard HoldenConservativeDepartment for TransportTabled Answered 28 November 2025UIN 93225

The question

To ask the Secretary of State for Transport, what assessment she has made of the potential impact of i) timetable planning, ii) signalling and iii) freight pathing margins on barrier down-times at level crossings; and how Network Rail monitors and reports performance experienced by road users at level crossings.

Answered by Keir Mather

Network Rail is responsible for assessing the impact of timetable changes, freight paths and upgrades to signalling on level crossing down-time, as part of its overall management of level crossings on the rail network. These arrangements are kept under review, to ensure crossings remain safe for all users while minimising the impact on communities where practicable.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim