Roads: Safety Barriers

Asked by Mr Richard HoldenConservativeDepartment for TransportTabled Answered 1 December 2025UIN 93461

The question

To ask the Secretary of State for Transport, how many kilometres of life-expired steel barrier have been replaced with concrete barrier on the Strategic Road Network in each of the last four years excluding upgrades delivered through the Smart Motorways Programme and the Smart Motorways Alliance; and what her projection is for steel-to-concrete barrier replacement outside the smart motorway programme in 2025–26.

Answered by Simon Lightwood

Through its renewals programme, National Highways has delivered 52.6 kilometres of concrete barrier over the last four years and are projecting to deliver a further 14 kilometres of concrete barrier in 2025-26. This is excluding upgrades delivered through the Smart Motorways Programme and Smart Motorways Alliance.

A breakdown of National Highways’ delivery over the four-year period:

2021-22

2022-23

2023-24

2024-25

RIS2 Total

Concrete Barrier (KM)

3.1

9.8

13.6

26.1

52.6

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim