Rosyth Dockyard: Repairs and Maintenance

Asked by Bell Ribeiro-AddyLabourMinistry of DefenceTabled Answered 3 December 2025UIN 94535

The question

To ask the Secretary of State for Defence, what is the projected cost of the planned infrastructural improvements at Rosyth Dockyard; whether the improvements will require the removal from the dockyard of radioactively contaminated equipment.

Answered by Luke Pollard

The preliminary plans for infrastructure upgrades at Rosyth Dockyard have been approved and industry has been engaged to begin processing the scheme design. Once the scheme design is complete, final costs for the project will be negotiated. The work will include the requirement to deliver a contingent docking facility for HMS Dreadnought during its sea trials at Rosyth Dockyard.

As part of the Submarine Dismantling Project, infrastructure upgrades at Rosyth will enable the removal and processing of all legacy radioactive waste, including radioactively contaminated equipment, from dismantled submarines. Activity at Rosyth has begun, with HMS Swiftsure being dismantled and a further six decommissioned nuclear-powered submarines awaiting disposal.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →