National Energy System Operator: Members
The question
To ask the Secretary of State for Energy Security and Net Zero, if he will impose a duty on the National Energy System Operator to inform hon. Members of connection applications in their constituencies.
Answered by Michael Shanks
Network connection applications are confidential to the parties involved before the point of a contract being signed, but details of generation and storage transmission connection agreements are published in the Transmission Entry Capacity Register TEC Register | National Energy System Operator. The equivalent for Interconnector projects is at Interconnector Register | National Energy System Operator.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →