River Great Ouse: Flood Control
The question
To ask the Secretary of State for Environment, Food and Rural Affairs, what the estimated cost is of fixing all sluice gates at (a) Brownshill and (b) St Ives.
Answered by Emma Hardy
The gate refurbishment project is currently undergoing phase 1 which includes inspections, surveys and testing to determine all aspects of phase 2 work required.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →