VerbatimParliament, as it happens

East West Rail Line: Costs

Asked by Richard FullerConservativeDepartment for TransportTabled Answered 22 January 2026UIN 105203

The question

To ask the Secretary of State for Transport, what recent estimate she has made of the cost per kilometre of East West Rail from Bedford to Cambridge.

Answered by Simon Lightwood

Capital cost estimates for Connection Stages 2 (Oxford-Bedford) and 3 (Oxford-Cambridge) routes were published by East West Rail Company in 2024. Final costs for the project will be driven by scope and design choices.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim