VerbatimParliament, as it happens

Motorways: Lighting

Asked by Mr Joshua ReynoldsLiberal DemocratDepartment for TransportTabled Answered 28 January 2026UIN 106876

The question

To ask the Secretary of State for Transport, if she will publish the TA 501 safety assessment and Scheme Appraisal Report for the removal of motorway lighting on the M4 between junctions 8 and 12; and what steps her Department is taking to ensure that the TA 501 methodology is applied transparently where safety infrastructure is removed.

Answered by Simon Lightwood

National Highways has a thorough, consistent and documented approach to the management of construction schemes. National Highways assessed the removal of lighting on the M4 between junctions 8 and 12 using TA49/07, which was the assessment tool before TA 501 was published in March 2020. National Highways has published the M4 J3-J8/9 and J10-J12 Road Safety Lighting Review, which included a summary of the personal injury collision data for the 5 years prior to the removal of lighting. Road casualty statistics and the underlying data are published annually by the Department for Transport.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim