VerbatimParliament, as it happens

M54: M6

Asked by Shaun DaviesLabourDepartment for TransportTabled Answered 12 March 2026UIN 118587

The question

To ask the Secretary of State for Transport, when the M54 to M6 link road route will be confirmed.

Answered by Simon Lightwood

The Preferred Route for the M54 to M6 Link Road scheme was announced in September 2018, following public consultation. The route selected provides the highest benefit to the local economy, the best journey time options, and was preferred by most of the respondents to the public consultation. The route includes a two-lane dual carriageway link road between M54 at junction 1 and M6 at junction 11.

Funding for the scheme was confirmed on 8 July 2025, following the conclusion of the Spending Review. The scheme will be formally confirmed as part of the setting of the third Road Investment Strategy (RIS3), planned to be published by the end of March 2026.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim