Renewable Energy: Lincolnshire

Asked by Sir John HayesConservativeDepartment for Energy Security and Net ZeroTabled Answered 20 April 2026UIN 124450

The question

To ask the Secretary of State for Energy Security and Net Zero, what estimate he has made of the number of renewable energy projects awaiting grid connection in (1) South Holland and the Deepings constituency and (2) Lincolnshire.

Answered by Michael Shanks

Information on projects holding connection agreements is available at TEC Register | National Energy System Operator for transmission projects and, for distribution projects, at National Grid - Embedded capacity register (Central and Southern Lincolnshire) and Northern Powergrid - Embedded capacity register (Northern Lincolnshire). Data is categorised by grid connection point, not geographic location of generation projects.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim