Railways: Devon

Asked by Martin WrigleyLiberal DemocratDepartment for TransportTabled Answered 28 April 2026UIN 128413

The question

To ask the Secretary of State for Transport, what guidance the Department issues on the acceptable duration of full closures of rail lines for planned engineering works, with particular reference to the coastal route between Newton Abbot and Dawlish.

Answered by Simon Lightwood

The Department for Transport does not set acceptability criteria for access to rail lines for engineering works. Access is agreed through the established regulatory and contractual framework. Network Rail engages train operators via the Network Code and Access Agreements to agree possessions, taking account of passenger and stakeholder impacts.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim