VerbatimParliament, as it happens

Artillery: Procurement

Asked by Mr Mark FrancoisConservativeMinistry of DefenceTabled Answered 26 May 2026UIN 1914

The question

To ask the Secretary of State for Defence, what is the total cost of the RCH 155m artillery system to the MoD in terms of a) acquisition cost and b) through-life cost.

Answered by Luke Pollard

In line with the Integrated Procurement Model, the UK’s Remote Controlled Howitzer 155 (RCH155) programme will deliver a Minimum Deployable Capability (MDC) within this decade. This capability is defined as a Royal Artillery Battery equipped with RCH155 platforms, having completed the necessary specialist training. As a minimum, the system will have an appropriate peacetime safety case to enable training on UK ranges, preparing the sub-unit for potential operational deployment.

The current acquisition cost for the RCH155 programme is estimated to exceed £1 billion. This figure comprises the £52 million Early Capability Demonstrator contract awarded in December 2025 in addition to the £53 million Long Lead Item contract let in March 2025, and the UK’s series production contract announced on 13 May 2026. The estimated Whole Life Cost of procuring and supporting a fleet of 72 RCH155 systems is expected to exceed £3 billion over the currently projected 25-year service life.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim