A1 (M): Contracts

Asked by Siân BerryGreen PartyDepartment for TransportTabled Answered 29 May 2026UIN 2522

The question

To ask the Secretary of State for Transport, how much the 30-year contract to Design, Build, Finance and Operate (DBFO) the A1(M) has cost the public finances during each financial year of the concession up to 31 March 2026, and to provide these costs in terms of actual spending in pounds for each year, rather than normalised to any other year.

Answered by Simon Lightwood

The costs associated with the A1(M) Alconbury to Peterborough DBFO contract vary by year and reflect actual payments made during the concession. Annual expenditure ranged from £5.8 million in 1996‑97 to a forecast £30.6 million for 2025‑26, with a total forecast cost to public finances of approximately £709.5 million over the 30-year concession period.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim