Disease Control: Harlow
The question
To ask the Secretary of State for Health and Social Care, for what reason the new biosecurity centre in Harlow will not be operational until 2038.
Answered by Mrs Sharon Hodgson
The UK Health Security Agency (UKHSA) will finalise the design of the Harlow site before construction begins, with phased occupation of the facility starting in the mid-2030s. A period of dual running with existing sites will ensure a safe and effective transition of operations. UKHSA will maintain operations at Colindale and Porton Down until Harlow is fully validated and operational in 2038.
Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →