VerbatimParliament, as it happens

Disease Control: Harlow

Asked by Esther McVeyConservativeDepartment of Health and Social CareTabled Answered 4 June 2026UIN 3208

The question

To ask the Secretary of State for Health and Social Care, for what reason the new biosecurity centre in Harlow will not be operational until 2038.

Answered by Mrs Sharon Hodgson

The UK Health Security Agency (UKHSA) will finalise the design of the Harlow site before construction begins, with phased occupation of the facility starting in the mid-2030s. A period of dual running with existing sites will ensure a safe and effective transition of operations. UKHSA will maintain operations at Colindale and Porton Down until Harlow is fully validated and operational in 2038.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim