VerbatimParliament, as it happens

Electric Vehicles: Charging Points

Asked by Mr Richard HoldenConservativeDepartment for TransportTabled Answered 10 June 2026UIN 6812

The question

To ask the Secretary of State for Transport, how many of the charge points allocated through the Local EV Infrastructure Fund are (a) operational and open to the public, (b) installed but awaiting grid connection and (c) allocated but not yet installed.

Answered by Keir Mather

The Local EV Infrastructure (LEVI) Fund is expected to support at least 100,000 chargers across England, building on over 120,000 public chargers already installed across the UK. As of 26 May 2026, 61 out of 81 local authority LEVI projects have been approved for delivery and 26 contracts have been signed by 17 Local Authorities. 136 charge points have been installed and are open to the public as of 1 May 2026, on top of over 17,000 supported via the prior On Street Residential Chargepoint Scheme (ORCS).

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim