The question

To ask the Secretary of State for Energy Security and Net Zero, what area of Grade 1, 2 and 3a agricultural land in Suffolk has been used for ground-mounted solar development since 2019; and if he will take steps to ensure future solar consents in that county prioritise lower-grade land.

Answered by Michael Shanks

Data on the area of land occupied by solar projects is contained in the Renewable Energy Planning Database (REPD). The Government does not currently categorise the data based on agricultural land type. However, work is underway to expand the REPD to include this feature.

Planning guidance makes clear that, wherever possible, developers should utilise brownfield, industrial, contaminated, or previously developed land. Where the development of agricultural land is shown to be necessary, lower-quality land should be preferred to higher-quality land.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim