Asked by Callum AndersonLabourDepartment for Energy Security and Net ZeroTabled Answered 7 July 2026UIN 14274

The question

To ask the Secretary of State for Energy Security and Net Zero, what assessment he has made of the adequacy of current electricity grid capacity to meet projected demand by 2035.

Answered by Martin McCluskey

The National Energy System Operator (NESO) conducts independent modelling of future electricity demand and supply and strategic planning of the transmission network.

NESO’s Future Energy Scenarios (FES) provide a range of credible pathways for Great Britain's energy system to 2050. This informs strategic electricity network planning by assessing future demand, generation, storage and flexibility requirements.1

NESO’s Beyond 2030 Update report (published 30th June), draws on the FES, and sets out the network infrastructure needed through the 2030s.2

NESO’s assessment indicates that demand can be met through timely delivery of recommended network infrastructure to enable generation planned for the 2030s.

  1. Future Energy Scenarios (FES) | National Energy System Operator
  2. Beyond 2030 - Electricity Transmission Update | National Energy System Operator

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim