VerbatimParliament, as it happens

Network Rail: Biodiversity

Asked by Greg SmithConservativeDepartment for TransportTabled Answered 7 July 2026UIN 14431

The question

To ask the Secretary of State for Transport, pursuant to the Answer of 24 June 2026 to Question 11452 on Network Rail: Biodiversity, what guidance Network Rail issues on when a habitat management plan is required; and how many such plans are currently in force.

Answered by Keir Mather

Network Rail has a company standard entitled ‘Biodiversity’ published in March 2023. Within this standard is a module entitled ‘Habitat Management Plan’ and its scope reads: ‘This module contains the key principles for the management and enhancement of biodiversity and prescribes requirements for producing habitat management plans (HMP) for the rail network.’

There are two levels of habitat management plan in use across the rail network: (1) generic habitat plans which provide detail at a whole route or habitat-type level; and (2) specific location plans which are a more detailed document providing guidance for a particular location.

At present there is almost 80 per cent of the network by area covered by generic habitat plans. There have also been almost 200 of the specific location plans produced; these include railway-designated nature sites as well as sites of special scientific interest.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim