VerbatimParliament, as it happens

South Western Railway: Standards

Asked by Mr Richard HoldenConservativeDepartment for TransportTabled Answered 10 July 2026UIN 14994

The question

To ask the Secretary of State for Transport, pursuant to the Answer of 29 June 2026 to Question 12576 on South Western Railway, what data her Department holds on the punctuality of South Western Railway services since 25 May 2025, broken down by reporting period.

Answered by Keir Mather

South Western Railway report Time-to-3 punctuality (the percentage of station stops arrived at within 3 minutes of their scheduled time) to DfT Operator. This data and more performance data is available on the ORR website here: Passenger rail performance | ORR Data Portal.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim