VerbatimParliament, as it happens

Solar Power

Asked by Christine JardineLiberal DemocratDepartment for Energy Security and Net ZeroTabled Answered 8 September 2026UIN 21348

The question

To ask the Secretary of State for Energy Security and Net Zero, what steps she is taking to allow greater flexibility within Smart Export Guarantee (SEG) eligibility where solar installations can demonstrate safety and compliance, even if they fall outside standard Microgeneration Certification Scheme routes.

Answered by Department for Energy Security and Net Zero

The eligibility criteria for the Smart Export Guarantee (SEG) are set out in legislation. These require installations and installers to be certified under the Microgeneration Certification Scheme (MCS) or a scheme accredited as equivalent. The Government has no current plans to review this requirement but will consider all scheme feedback received in the forthcoming SEG review.

Although such certification is required to access the SEG, suppliers remain free to offer export tariffs outside the SEG.

Verbatim has judged this answer against the question that was actually asked — answered, partly answered, or evaded. Sign in to see the verdict →

Open this question in Verbatim →

Every written question, searchable

155,000 questions tabled since the election, with the answer each department gave — and the ones still unanswered, with the clock running. Free to search.

Search written questions →Read on Verbatim